Fully Automatic Oral Thin Film Making Machine

Fully automatic coating and drying line for oral thin films, transdermal patches and dental strips — PLC-controlled, modular design, GMP-compliant with UL electricals.

The OZM-360/10M is a fully automatic production line for the preparation of oral fast-dissolving films, subcutaneous permeation membrane agents, transdermal patches, dental patches and other film formulations through single-side or composite coating processes. Engineered for large-scale industrial production with excellent product quality and efficient output, it is widely used in the pharmaceutical, food, cosmetics and pet industries.

The OZM-360/10M is built for high-volume film manufacturing where quality, hygiene and changeover flexibility all matter.

  • Single-side or composite coating for food films and pharmaceutical films alike
  • Modular main structure — each module can be independently disassembled or installed for fast configuration and service
  • All production operations and parameters fully controlled by a PLC touchscreen panel
  • Independently partitioned drying section with per-segment control of temperature, humidity, concentration and drying-air volume
  • Transmission and operation areas sealed and isolated with stainless steel plates for a clean production zone
  • Safety alarm and automatic stop when film material runs out or breaks
  • All product-contact parts in stainless steel or non-toxic materials (GMP); all electrical components to UL safety standards
ModelOZM-360/10M
TypeFully automatic film casting line — single-side or composite coating
ProductsOral fast-dissolving films · transdermal patches · dental strips · permeation membrane agents
Control systemPLC touchscreen — full production and parameter control
Drying sectionIndependently partitioned zones — per-segment temperature, humidity, concentration and drying-air volume control
ConstructionModular main structure — each module independently detachable and installable
Hygiene designTransmission and operation areas sealed and isolated with stainless steel plates
Product-contact partsStainless steel / non-toxic materials — GMP compliant
ElectricalUL safety standards
SafetyFilm run-out / break alarm with automatic stop
IndustriesPharmaceutical · food · cosmetics · pet products

One line, five steps, zero hand-offs

Product description

The OZM-360/10M is built for high-volume film manufacturing where quality, hygiene and changeover flexibility all matter.

  • Single-side or composite coating for food films and pharmaceutical films alike
  • Modular main structure — each module can be independently disassembled or installed for fast configuration and service
  • All production operations and parameters fully controlled by a PLC touchscreen panel
  • Independently partitioned drying section with per-segment control of temperature, humidity, concentration and drying-air volume
  • Transmission and operation areas sealed and isolated with stainless steel plates for a clean production zone
  • Safety alarm and automatic stop when film material runs out or breaks
  • All product-contact parts in stainless steel or non-toxic materials (GMP); all electrical components to UL safety standards

Product related

Frequently Asked Questions (FAQs)

Please visit our FAQ page before reaching out to our customer support. Our team regularly updates this resource to provide you with the most up-to-date and comprehensive information, saving you valuable time.

Are your machines GMP-compliant?

All DIAGNOSEX process equipment is designed and manufactured in accordance with GMP / cGMP principles. Documentation packages supporting regulatory submissions — including material certificates, calibration records, and design qualifications — are available upon request.

Yes. Vial and stopper formats, throughput, automation level, cleanroom classification, and integration with upstream or downstream equipment can all be tailored to your process. Share your requirements and our engineers will propose a configuration.

Standard configurations generally ship within 8–12 weeks after order confirmation. Customized or fully integrated lines typically require 12–16 weeks, depending on the scope of engineering involved.

Yes. Our engineers provide on-site installation, commissioning, and structured operator and maintenance training. Remote commissioning support and English-language video training are also available.